Water · Lenasia Ext 3
Planned water throttling at the Lenasia High Level Reservoir
Johannesburg Water plans to throttle supply to the Lenasia High Level Reservoir from 23–24 November, reducing supply by 50% to 100%; some outlets may be completely closed. Timing may vary with operational conditions.
Timeline
- Official notice
Johannesburg Water’s schedule includes daily throttling at the Lenasia High Level Reservoir from 23–24 November 2026.
